EQUIPMENT OVERVIEW
A requirement-led approach.
A Christmas tree combines valves, connections and associated equipment in a specified arrangement at the wellhead. The flow paths, valve functions and operating interfaces should be clear in the enquiry.
Send your tree schematic, bill of materials and required end connections. Identify the manual or actuated functions, instrumentation interfaces and equipment boundaries to be included in the sourcing scope.
For replacement or extension work, include the existing tree details. The proposed assembly and supporting documentation must be checked against the project requirements and mating equipment.
Applications
- Production tree package enquiries
- Completion equipment procurement
- Defined tree assembly replacements
DEFINE YOUR REQUIREMENT
Technical configuration
Tell us the configuration your application requires. The fields below describe buyer inputs, not fixed product specifications.
- Tree schematic and valve arrangement
- Specify in your RFQ
- Bore and working pressure requirement
- Specify in your RFQ
- Material and temperature requirements
- Specify in your RFQ
- Connections and wellhead interface
- Specify in your RFQ
- Actuation and control requirements
- Specify in your RFQ
- Required accessories and documentation
- Specify in your RFQ
Availability and suitability depend on the selected equipment and supplier. Proposed alternatives require your review.
Standards & requirements
Identify any API 6A requirement, required edition and project-specific acceptance criteria. Compliance is subject to review of the proposed supplier and equipment documentation.
SUPPORTING RECORDS
Documentation to request
List the records you need with your RFQ. Supplier availability, traceability and document scope must be confirmed before order.
- Tree arrangement drawing and bill of materials, if available
- Requested component and assembly test records
- Material traceability and conformity records for supplier confirmation
