EQUIPMENT OVERVIEW
A requirement-led approach.
Blowout preventers form part of a well-control system. The required assembly depends on the operation, the well program and the equipment interfaces; a product name alone is not enough to define an acceptable supply.
Nordensol Equipment reviews BOP enquiries against the buyer's specification. Send the stack arrangement, component list and required operating conditions, identifying whether you need an annular preventer, ram preventer, replacement component or a defined assembly.
Identify the required condition and inspection scope in the RFQ. The proposed configuration, source and supporting records are subject to confirmation in the quotation and technical review.
Applications
- Drilling well-control equipment enquiries
- Workover and intervention equipment requirements
- BOP replacement and stack component procurement
DEFINE YOUR REQUIREMENT
Technical configuration
Tell us the configuration your application requires. The fields below describe buyer inputs, not fixed product specifications.
- BOP type and stack arrangement
- Specify in your RFQ
- Bore size and working pressure
- Specify in your RFQ
- Top, bottom and outlet connections
- Specify in your RFQ
- Operating and hydraulic control requirements
- Specify in your RFQ
- Temperature and fluid service conditions
- Specify in your RFQ
- Required equipment condition, quantity and delivery location
- Specify in your RFQ
Availability and suitability depend on the selected equipment and supplier. Proposed alternatives require your review.
Standards & requirements
State whether API 16A applies, including the required edition and project requirements. Supplier compliance and any licensing must be verified for the proposed equipment.
SUPPORTING RECORDS
Documentation to request
List the records you need with your RFQ. Supplier availability, traceability and document scope must be confirmed before order.
- Manufacturer datasheet and general arrangement, if available
- Required pressure-test and inspection records to be confirmed with supplier
- Traceability and certificate requirements to include in the RFQ
